| | | | | RFP/Bid |
|
Title and Description
|
Bid Number
|
Contact Person
|
Closing Date and Time
|
Lifeguard Headquarters and Public Restroom Project The work consists of constructing a new Lifeguard Headquarters and Public Restroom facility at Main Beach Park, 175 North Coast Highway, Laguna Beach. The new facility will be a one story building of approximately 3,000 square feet with a basement of equal size for a total of 6,000 square feet. The cost for construction, based on preliminary plans, is $6 million.
Bidding is restricted to pre-qualified general contractors that were selected through a previous process. Sub-contractors are not required to be pre-qualified and may bid directly to the approved pre-qualified general contractors identified in the notice inviting bids.
|
CIP 206L
|
Wade Brown, Project
|
06/22/2012 @ 2:00 PM
|
| | Closed RFP/Bid |
|
Title and Description
|
Bid Number
|
Contact Person
|
Closing Date and Time
|
Park Avenue View Park and Laguna Canyon Frontage Road Passive Park Construction The work comprises the construction of sidewalk, decorative concrete, planting, irrigation, grading, roadway trench repair, traffic control and other items at two different new park locations in the City of Laguna Beach. The engineer's estimate for the Park Avenue View Park and Laguna Canyon Frontage Road Passive Park construction project is $85,000.
Bid Results
|
CIP 388 (Now Closed)
|
Mark Trestik, Assistant City Engineer Email
|
03/30/2012 @ 2:00 PM
|
City Hall Roof Replacement Project The work comprises the replacement of a portion of the City Hall roof located at 505 Forest Ave, in the City of Laguna Beach. The scope of work includes replacement of the roof on the east side of the building, including the mechanical well areas, per the project technical specifications. The west portion of the roof, along with the roofing above the Recreation Services Center and the Fire Department are not included in this project.
Bid Results
|
310 (Now Closed)
|
Lisa M. Penna, PE, Consulting Project Manager Email
|
02/22/2012 @ 2:00 PM
|
Glenneyre Parking Structure, Structural Rehabilitation The work comprises the construction of structural strenghening of the existing parking structure including placing new piles and concrete shear walls and FRP overlays on existing columns, in the City of Laguna Beach.
Bid Results
|
CIP 431 (Now Closed)
|
Lisa M. Penna, PE, Consulting Project Manager Email
|
02/09/2012 @ 2:00 PM
|
City Hall Slope Debris Wall The work comprises of clearing and grubbing, removal of vegetation, removal of chain link fence, modification of water service piping, construction of approximately 85 linear feet of 3' high wood lag debris wall, 196 linear feet of 5' high wood lag debris wall, and 111 linear feet of 8' high wood lag debris wall, and approximately 73 variable height drilled caissons (24" diameter drilled hole), adjacent to City Hall parking, plus potentially 98 additional linear feet of 8' high wood lag debris wall and approximately 14 variable height drilled caissons (24" diameter drilled hole), adjacent to ther garage shed in the City Hall parking lot, in the City of Laguna Beach. The Engineer's Estimate is $484,484 for the Base Bid and $121,627 for Bid Alternate 1 and $178,855 for Bid Alternate 2.
Bid Results
|
CIP 129 (Now Closed)
|
Lisa M. Penna, PE Consulting Project Manager Email
|
01/12/2012 @ 2:00 PM
|
Diamond/Crestview Guard Railing Construction The project includes the construction of metal beam guard railing, asphalt concrete curbs and paving, redwood headers and object markers at sixteen different locations within the Diamond/Crestview neighborhood of the City of Laguna Beach.
|
CIP 336 (Now Closed)
|
Mark Trestik, Assistant City Engineer Email
|
01/09/2012 @ 2:00 PM
|
Junior Lifeguard Storage at Heisler park Constructing a 325 square foot storage building entirely of concrete and masonry and extends into a hillside. Existing park improvements must be preserved and maintained accessible to the public during construction. The site is located just north of the public rest room building in Heisler Park.
Bid Results
|
377-A (Now Closed)
|
Wade Brown, Project Director Email
|
01/05/2012 @ 4:00 PM
|
Notice Requesting Pre-Qualification of Bidders for Construction of Lifeguard Headquarters and Public Restroom The City of Laguna Beach will be constructing a new Lifeguard Headquarters and Public Restroom facility at Main Beach Park, 175 North Coast Highway, Laguna Beach, CA which is located just north of the intersection of Broadway (Highway 133) and Coast Highway. The project will include the demolition of the existing headquarters building and sewer lift station which will be abandoned by the start of construction. The new facility will be a one story building of aporoximately 3,000 square feet with a basement of equal size for a total of 6,000 square feet. The cost estimate for construction, based on preliminary plans, is $7 million.
|
CIP 206 Pre-qualification (Now Closed)
|
Wade Brown, Project Director Email
|
12/16/2011 @ 5:00 PM
|
Downtown Specific Plan Area/Laguna Canyon Road Parking Management Plan RFP
The City of Laguna Beach is seeking proposals and qualifications from experienced consultants to prepare recommendations to maximize effectiveness of existing public and publicly accessible parking resources within the Downtown Specific Plan and Laguna Canyon Road areas. The conclusions of the Consultant will generally consist of an evaluation and inventory of best management practices for more efficient use of the City’s parking resources in the project area. The selected consultant will analyze the current parking operations and management practices within the Downtown and Laguna Canyon areas, during both peak and non-peak conditions and make planning, financial, and operational recommendations for the project area. The submitted Downtown/Laguna Canyon Area parking recommendations should recognize the importance of a balanced, multimodal transportation network that meets the needs of all users of streets, roads, and highways; including, pedestrians, bicyclists, children, persons with disabilities, seniors, movers of commercial goods, users of public transportation and motorists.
Background Studies
|
(Now Closed)
|
Scott Drapkin (Senior Planner) 949-497-0362 or Monica Tuchscher (Principal Planner) 949-497-0745 Email
|
12/16/2011 @ 5:00 PM
|
Request for Qualifications Request for qualifications for design of an erosion protection project for Laguna Canyon Creek at the animal shelter.
|
CIP 285 (Now Closed)
|
Wade Brown, Project Director Email
|
11/07/2011 @ 5:00 PM
|
Fire Station No. 4 Window Replacement Project In general, the work includes the removal and replacement of 23 existing windows at Fire Station No. 4 in accordance with the project specifications and installation instructions. Windows on the second floor of the Fire Station opposite Virginia Way (overlooking residences) shall be frosted windows per manufacturer's recommendations. New interior window treatment shall be provided on all windows in accordance with the project specifications. Fire Station No. 4 is located at 31646 2nd Avenue in the City of Laguna Beach.
Bid Results and Subcontractors
|
CIP 441 (Now Closed)
|
Lisa M. Penna, Consulting Project Manager Email
|
10/18/2011 @ 2:00 PM
|
Construction Management Services for Lifeguard Headquarters The City of Laguna Beach, California is issuing a Request for Proposals (RFP) for the selection of a Construction Management (CM) firm for work related to the construction of a Lifeguard Headquarters and Public Restroom.
|
CIP 206 (Now Closed)
|
Wade Brown, Project Director Email
|
10/10/2011 @ 4:00 PM
|
Dorn Court Slope Repair Project Construction of a lag retaining wall and drainage inlets and pipes. Contact Fred Shahidi for more information.
|
WQ001 (Now Closed)
|
Fred Shahidi Email
|
09/22/2011 @ 2:00 PM
|
20530 Laguna Canyon Road Site Clean Up In general, the work consists of the removal and transportation of various materials including dirt, asphalt and concrete stockpiled at the site. The contractor must furnish all equipment, materials, tools, labor and any incidentals required to complete the work. The Contractor shall possess either a valid Class A or Class C-12 Contractor License at the time of submitting bids.
|
2011-3106 (Now Closed)
|
Joe Chiquete, Project Manager Email
|
09/15/2011 @ 2:00 PM
|
City Hall Network Cabling Project In general, the project consists of updating the data cabling network throughout the City Hall first and second floor, two exterior trailers and one outlying maintenance building. The current network consists of miscellaneous category 5 and category 3 cabling throughout. The City Hall building currently has two server rooms, and one intermediate distribution frame. The new cabling project will consist of installing new category 6e cable to the workstations, installing new multimode fiber optic cable for the backbone, and installing new PVC conduit for the fiber optic cable to feed existing areas.
Bid Results
|
Admin01 (Now Closed)
|
Ed Beracoechea Email
|
08/29/2011 @ 4:00 PM
|
Hillcrest Drive Sidewalk Construction In general, the work comprises the demolition of existing pavement, curb and gutter and the construction of sidewalk, AC paving, curb and gutter, handrails, striping and pavement markings in the City of laguna Beach. The Engineer's estimate of probable costs is $80,000.
Bid Results
|
CIP No. 074 (Now Closed)
|
Mark Trestik, Assistant City Engineer Email
|
06/24/2011 @ 2:00 PM
|
Circle Way Storm Drain and Stairs Repair
The work comprises the construction of Storm Drain Improvements, Storm Drain Outfall Structure, Stairway Replacement, Foundation Structure, Sewer Relocation, Telephone Line Relocation, Water Lateral Connection, Electrical Connection, Driveway Approach, Cold Milling A.C. Pavement, Variable Thickness A.C. Overlay, Landscape and Irrigation, Regrading and Erosion Repair, Utility Pad and Bench Furniture, and Adjustment of Existing Facilities to Grade in the City of Laguna Beach.
Bid results
Secifications and Bid Document
10-6755 Geotech Report
Plan Holder List for Circle Way Storm Drain and Stairs Repair (revised 6/23/11)
Circle Way Addendum No. 1
Circle Way Addendum No. 2
Circle Way Addendum No. 3
25 Drawings:
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11,, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, and 25.
|
364
|
Lisa M. Penna, Consulting Project Manager
|
06/23/2011 @ 2:00 PM
|
City Hall Roof Replacement/HVAC Upgrades and Energy Efficient Systems Project This is an RFP for a Design/Build Energy Efficiency Performance Contract.
The work comprises the design and construction of HVA equipment replacement and upgrades at City Hall, replacement of the City Hall roof and lighting retrofits at various City facilities in the City of Laguna Beach. Proposers are advised that this Performance Contract has design/build elements included. All aspects of the project are considered design/build, meaning that the Contractor shall conduct the evaluation, develop the calculations, complete the design, obtain plan check approval, and construct the improvements.
City Hall Roof Replacement and Energy Efficient Units
Climatec Proposal
Johnson Controls Proposal
|
CIP 310 (Now Closed)
|
Lisa Penna, Consulting Project Manager Email
|
06/09/2011 @ 10:00 AM
|
Underground Utility Assessment District 2009-2 Allview Terrace The project provides for the conversion of overhead utilities, including SCE, Verizon and Cox Communications, into underground utilities.
Bid Results
|
AD 09-2 (Now Closed)
|
Joe Chiquete, Project Manager Email
|
06/07/2011 @ 10:00 AM
|
Lang Park Community Center Improvements Project Lang Park Community Center improvements - roof, window, flooring replacement and painting.
|
294
|
Lisa M. Penna, Consulting Project Manager
|
05/12/2011 @ 2:00 PM
|
December 2010 Storm Damage Repair - Dog Park Storm Drain Replacement
Bid Results
|
FEMA 1952 DR1
|
Mark Trestik, Assistant City Engineer
|
04/28/2011 @ 2:00 PM
|
2011 Citywide Sidewalk Repair - CIP 224
The project provides for the replacement of approximately 8,000 feet of damaged sidewalk, curb and gutter at various locations Citywide. In general, work items include removal and replacement of concrete improvements, root pruning, slot patching, curb ramp construction, root barrier installation and traffic control.
Bid opening is March 31, 2011 at 2:00 p.m.
|
224
|
Mark Trestik, Assistant City Engineer
|
03/31/2011 @ 2:00 PM
|
Laguna Canyon Frontage Road Street Light Relocation - CIP 429 Construct approximately 45 LF of 6" PCC curb and gutter, and construct approximately 350 LF of SCE and CATV trench including installation of conduit, AC paving.
|
429
|
Joe Chiquete, Project Manager
|
01/31/2011 @ 2:00 PM
|
| |
| | |
| |
|  |